|
|
| Public Works |
 |  |  | | Utility Permits can be obtained at 130 Delafield. They are required anytime utility work is constructed in the Public Right-of-way. The contractor needs to be bonded or have a certificate of insurance. For Information pertaining to the new fee, click below: New Permit Fees for Construction in the Right-of-Way | |
|
|
 |
|
Fred V. Abadi
Ph.D., P.E.
Director of Public Works
130 Delafield Street Waukesha, WI 53188
P: 262-524-3600 F: 262-524-3898
Email us
|
|